Plaster wall – a layer of hardened mortar, which was deposited on their surfaces in a raw, more plastic state. Plastering in stages – from one to four devices, with a mandatory pre- surface preparation. Repair of apartments in Kharkov cement plaster or cement holds-izveskovym solution using steel lighthouse and square, which allows you to align the plane of the walls. Actually, this is the main purpose of plaster – to make perfectly smooth walls up to 2 mm. Plastered walls with metal rails lighthouse in the following sequence. After pretreatment (Cleaning, priming), the entire work surface is divided into equal sections labeled 1-1.5 m wide, and according to the label with colored thread discourage vertical lines.
Then fitted plaster rails in height, cutting off the excess with scissors for metal. Then you need at the edges of the walls, vertical by level (water level), and set two guides. They are mounted in a solution that is applied to each profile in several places. The recommended distance between mounting points – about 0.5 m, just as these points must be at least five. The guides are pressed against the wall so that their lateral wings through the hole left in the solution which they fixed.
Above and below the lighthouse hammered a nail and pull cords (measured diagonally) on a par with projections profiles. All other rails must be mounted vertically so that the their projections related to the strained cords. Thus it is necessary to monitor the verticality of each beacon in the level. When all profiles will be attached, it is necessary to solidify the solution. Mounting knee is not too differ from the technology attachment Lighthouse guides. Similarly, need to clean and prepare the work surface, which are attached to profiles. With scissors, metal square fit to size, before installation begins. First on the corner of a wall is applied to the solution, which is pressed into square.